Overlake School

Redmond, Washington

ROLE: planning, architecture, landscape architecture

SCOPE OF WORK: campus planning and design through construction administration

STATUS:

Humanities Building, completed 2009
Technology/Language Center, completed 2010
Fifth/Sixth Grade Center, completion scheduled February 2011
Campus Center Addition

CONSTRUCTION COSTS: estimated $16.5 million

CONSTRUCTION TEAM: Lydig Construction (Humanities) Bayley Construction (TLC)

CLIENT: Overlake School

AWARDS: LEED Certified (TLC)

This multi-phase project includes construction of three separate classroom buildings to replace existing structures on campus as well as remodeling and additions to the Campus Center Cafeteria and School Library. These projects will add a total of over 37,000 gross square feet of new classroom and support space as well as campus site improvements to Overlake’s rural campus. The design of these projects requires sensitivity to the complexities of Overlake’s program as well as the complexities of the existing physical campus on a sloping site with multiple wetlands. Proposed sustainability features include a vegetated green roof, storm water catchment system, reclaimed/recycled materials and efficiency exceeding code requirements for mechanical systems and building envelope.